Building Climate Resilience in Wilmington

Route 62 in Wilmington is an intensely travelled road and one culvert – where the road crosses Martin’s Brook – is in desperate need of an upgrade. This structure received a “serious” condition rating in a 2024 MassDOT assessment and routinely makes flooding worse around Martins Pond.  

Join us for a discussion on why this is a critical project for Wilmington and what’s being done to address it. Our guests include: 

  • Amber Carr, Stream Continuity Program, Massachusetts Division of Ecological Restoration
    Paul Alunni, Engineer, Town of Wilmington
  • Gregory Gaudreau, Senior Engineer, The Engineering Corp
  • Valerie Gingrich, Director of Planning and Conservation, Town of Wilmington
  • Robert Niccoli, Structural Engineer, The Engineering Corp

Moderated by Neil Shea, Restoration Program Director, Ipswich River Watershed Association 

Thank you to the MA Municipal Vulnerability Preparedness (MVP) Program for supporting this project.

Date

Apr 08 2025
Expired!

Time

6:00 pm - 7:30 pm

Location

Wilmington Town Hall
121 Glen Rd., Wilmington, MA 01887

Leave a Reply

Your email address will not be published. Required fields are marked *